Quote:
Originally Posted by Auricom
These are all the 150-155 codes:
150 Planning of bodyshell / display of chassis number and F2 date [Production begins/Production started] [Shell = "Body in White"]
151 Receipt of shell / review and, if necessary, correction of F2 date [Exterior body assembly begins/Entry body shop-serial # assign]
152 Receipt of paint shop / review and, if necessary, correction of F2 appointment [In the paint booth/Entry paint shop]
153 Receipt of assembly / review and, if necessary, correction of F2 appointment [Entering Assembly Line/Entry assembly]
154 Final assembly / inspection and, if necessary, correction of the F2 date [Assembly in progress/Assembly]
155 End of assembly (F1) and final inspection / review and, if necessary, correction of F2 date [Quality Check, Production completed, Final Assembly/Assembly finish-quality check]
|
Hello,
What are the usual reasons if a car is in production status 155 for about a month ?
My car X3 m40i was produced on 23rd May at Rosslyn plant in South Africa and since 24th it is still in status 155. My dealer does not have any details...
I saw cars built three weeks later than mine which are already on the ship towards Europe.
I just wonder what could be the issue ?
Thank you.