Production status

Not sure what the timing is for production is, but I've been stuck in "Production begins" for the past 2 weeks. Spoke to a BMW genius rep and was told that its scheduled for finish date of 3/26. In less than 4 days away, it seem unlikely. Is this normal?

Last edited by dream54ing; 03-22-2019 at 09:23 AM.. Reason: date error
Appreciate 0
      03-22-2019, 09:17 AM   #2
cdchris1
Private
United_States
44
Rep
63
Posts

Drives: 2019 X5 40i
Join Date: Feb 2019
Location: Chicago

iTrader: (0)

Garage List
2019 BMW X5  [0.00]
Mine was in production begins for quite a while as well. It had a completion date of 3/16, so a week or so before yours (I assume you mean 3/26 not 2/26). If it is like mine, it will change a day or two before to the next step. Then mine jumped several steps and was ready for transport by the following Tuesday. I'm taking delivery tomorrow.
Appreciate 0
      03-22-2019, 09:18 AM   #3
russelldav
456bhp for breakfast
russelldav's Avatar
Canada
425
Rep
913
Posts

Drives: 2019 X5 50i
Join Date: Oct 2013
Location: Vancouver, Canada

iTrader: (0)

Quote:
Originally Posted by dream54ing View Post
Not sure what the timing is for production is, but I've been stuck in "Production begins" for the past 2 weeks. Spoke to a BMW genius rep and was told that its scheduled for finish date of 2/26. In less than 4 days away, it seem unlikely. Is this normal?
Production takes about 24 hours once it starts so this sounds normal.
Appreciate 0
      03-22-2019, 09:28 AM   #4
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by russelldav View Post
Production takes about 24 hours once it starts so this sounds normal.
I see, thanks Russell! The wait is killing me! lol

Quote:
Originally Posted by cdchris1 View Post
Mine was in production begins for quite a while as well. It had a completion date of 3/16, so a week or so before yours (I assume you mean 3/26 not 2/26). If it is like mine, it will change a day or two before to the next step. Then mine jumped several steps and was ready for transport by the following Tuesday. I'm taking delivery tomorrow.
yes, date corrected. That's comforting to know! Its going to be a long day or two thanks Chris! Congrats on yours!!
Appreciate 0
      03-22-2019, 10:22 AM   #5
thomas_Rp
Second Lieutenant
thomas_Rp's Avatar
126
Rep
250
Posts

Drives: X5 G05; 535 F10
Join Date: Jul 2010
Location: Texas

iTrader: (0)

How many days does it usually take to produce an x5?
Appreciate 0
      03-22-2019, 11:01 AM   #6
russelldav
456bhp for breakfast
russelldav's Avatar
Canada
425
Rep
913
Posts

Drives: 2019 X5 50i
Join Date: Oct 2013
Location: Vancouver, Canada

iTrader: (0)

Quote:
Originally Posted by thomas_Rp View Post
How many days does it usually take to produce an x5?
Final assembly is a matter of hours not days. Not sure how many production hours there are in total if you include all the sub assemblies and parts
Appreciate 0
      03-22-2019, 11:05 AM   #7
adgriffi
Private
adgriffi's Avatar
United_States
16
Rep
71
Posts

Drives: 2019 X5 40i (on order)
Join Date: Jul 2011
Location: Wiesbaden, Germany

iTrader: (0)

Garage List
2012 BMW 135i  [9.00]
Quote:
Originally Posted by thomas_Rp View Post
How many days does it usually take to produce an x5?
"Production Begins" means they're gathering all the parts for your specific build and getting them ready to put in the line... that way when your car actually enters the line everything is ready to go.

It usually sits in production begins for a week or a week and a half (with or course some exceptions being less, some being more) before moving. Then suddenly it will move -- from body shop, paint shop, assembly, and finally production complete (status 155). This entire part of the process takes 24 -36 hours. They run the factory 24-hours a day so often it will jump two or three steps overnight.

Here's a good guide for tracking production:
https://www.bimmerfest.com/forums/sh...d.php?t=894728

Last edited by adgriffi; 03-22-2019 at 12:04 PM..
Appreciate 1
      03-22-2019, 11:12 AM   #8
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by adgriffi View Post
"Production Begins" means they're gathering all the parts for your specific build and getting them ready to put in the line... that way when you're car actually enters the line everything is ready to go.

It usually sits in production begins for a week or a week and a half (with or course some exceptions being less, some being more) before moving. Then suddenly it will move -- from body shop, paint shop, assembly, and finally production complete (status 155). This entire part of the process takes 24 -36 hours. They run the factory 24-hours a day so often it will jump two or three steps overnight.

Here's a good guide for tracking production:
https://www.bimmerfest.com/forums/sh...d.php?t=894728
Thanks, this is very helpful!!
Appreciate 0
      03-22-2019, 11:26 AM   #9
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

from the link...

List of common BMW status codes and their meanings:

0 Order deleted by NA
17 Order not Specified
37 Order is at BMW NA
87 Production Week Assigned
97 Order sent to AG
100 Order deleted by AG
101 Error in data transmitted
102 Special Order (no Prod Week)
105 Order out of Prod. Period
111 Order Accepted at AG
112 Order scheduled for Production - Up to this point you can still make changes to the car such as options, colors, etc. However, once the car goes to status 150, you cannot make any changes since the car is now in production
150 Production Started
151 Body Shop Started
152 Paint Shop Started
153 Assembly Started
155 Production Completed
160 Released to Distribution
168 AG Stock
170 Waiting Workshop
172 Planned for Workshop
174 Workshop Entry
176 Workshop Complete
180 Waiting for Export Dispatch
181 Waiting for Domestic Dispatch
182 Schedule for Carrier
190 In transit to port of exit
191 Returned to BMW AG
193 Arrived at Port of Exit
194 Selected for Shipment
195 Shipped from Port of Exit
196 Shipment Arrival at destination port?


General Timeline of Events:

Build start (150) to build finish (155): 1-2 weeks
Build finish (155) to Scheduled for Carrier (182): 1 day
Status 182 to 190 (on a train to bremerhaven):1-3 days
Status 190 to 193 (at port awaiting a ship): 1-2 days
Status 193 to 195 (on a ship): 3-5 days for east coast delivery, 5-12 days for west coast delivery (more detail on this later)
Shipping time from Bremerhaven to East Coast: 12-17 days depending on the number of stops
Shipping time from Bremerhaven to West Coast: About 30 days
Offload at port: 1 day
Processing through customs: 1-2 days
Process through BMW Vehicle Processing Center (VDC) and onto a carrier: 2-5 days
Shipping time on carrier to Dealership: 1-4 days
Appreciate 0
      03-22-2019, 12:35 PM   #10
dbull2
Private First Class
United_States
57
Rep
163
Posts

Drives: 2019 BMW X5; 2017 Audi Q7
Join Date: Feb 2019
Location: North Little Rock, AR

iTrader: (0)

Garage List
2017 Audi Q7  [0.00]
2019 BMW X5  [0.00]
Quote:
Originally Posted by dream54ing View Post
I see, thanks Russell! The wait is killing me! lol



yes, date corrected. That's comforting to know! Its going to be a long day or two thanks Chris! Congrats on yours!!
I am in the same boat. My finish date is 3/26 also.

Here is my timeline so far:
Order Placed 3/1/2019
Scheduled for Production 3/7/2019
Production Begins 3/15/2019
Exterior Body Assembly Begins
In The Paint Booth
Entering Assembly Line
Assembly In Progress
Quaility Check
Final Assembly scheduled for 3/26/19

I am tracking an X5 that is scheduled for final assembly on 3/22/19. Its status changed from Production Begins to Entering Assembly Line just this morning.

I plan on posting the entire timeline once i take delivery.
Appreciate 0
      03-22-2019, 01:25 PM   #11
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by dbull2 View Post
I am in the same boat. My finish date is 3/26 also.

Here is my timeline so far:
Order Placed 3/1/2019
Scheduled for Production 3/7/2019
Production Begins 3/15/2019
Exterior Body Assembly Begins
In The Paint Booth
Entering Assembly Line
Assembly In Progress
Quaility Check
Final Assembly scheduled for 3/26/19

I am tracking an X5 that is scheduled for final assembly on 3/22/19. Its status changed from Production Begins to Entering Assembly Line just this morning.

I plan on posting the entire timeline once i take delivery.
thats funny, i was doing the same thing! thought i was a bit crazy doing it, lol...

Ordered: 2/16/19 (original order date) (3/4/19 was the re-order due to 3 row seating)
Production scheduled: 3/10/19
Production begins: 3/13/19
Exterior Body Assembly Begins:
In The Paint Booth:
Entering Assembly Line:
Assembly In Progress:
Quality Check:
Final Assembly: ~3/26/19
Delivered:
Appreciate 0
      03-22-2019, 02:18 PM   #12
frank19x5
Private First Class
frank19x5's Avatar
138
Rep
147
Posts

Drives: 2019 BMW X5 xDrive 40i
Join Date: Feb 2019
Location: CT, USA

iTrader: (0)

Longest wait for me will be end of production date (3/18) to pickup at the Performance Center (4/26). The days are dragging. I ordered on 3/5.
Appreciate 0
      03-22-2019, 02:23 PM   #13
dbull2
Private First Class
United_States
57
Rep
163
Posts

Drives: 2019 BMW X5; 2017 Audi Q7
Join Date: Feb 2019
Location: North Little Rock, AR

iTrader: (0)

Garage List
2017 Audi Q7  [0.00]
2019 BMW X5  [0.00]
Quote:
Originally Posted by dream54ing View Post
thats funny, i was doing the same thing! thought i was a bit crazy doing it, lol...

Ordered: 2/16/19 (original order date) (3/4/19 was the re-order due to 3 row seating)
Production scheduled: 3/10/19
Production begins: 3/13/19
Exterior Body Assembly Begins:
In The Paint Booth:
Entering Assembly Line:
Assembly In Progress:
Quality Check:
Final Assembly: ~3/26/19
Delivered:

My old project management skills kicking in. Got to track everything!
Appreciate 0
      03-22-2019, 02:44 PM   #14
davramic
Private First Class
davramic's Avatar
United_States
144
Rep
148
Posts

Drives: 2019 X5 50i
Join Date: Aug 2010
Location: Medford, OR

iTrader: (3)

Quote:
Originally Posted by dream54ing View Post
Not sure what the timing is for production is, but I've been stuck in "Production begins" for the past 2 weeks. Spoke to a BMW genius rep and was told that its scheduled for finish date of 3/26. In less than 4 days away, it seem unlikely. Is this normal?
Mines due done on the same day! Also had the stuck in “production begun” status for 2 weeks.

What did you get?
Appreciate 0
      03-22-2019, 02:51 PM   #15
speuk
Registered user
United Kingdom
78
Rep
422
Posts

Drives: G05 3.0d MSport / F23
Join Date: Apr 2007
Location: south bucks

iTrader: (0)

Garage List
2010 f07 SE GT  [0.00]
Quote:
Originally Posted by dream54ing View Post
Not sure what the timing is for production is, but I've been stuck in "Production begins" for the past 2 weeks. Spoke to a BMW genius rep and was told that its scheduled for finish date of 3/26. In less than 4 days away, it seem unlikely. Is this normal?
Mine went through 5100 body shop start and painting to 5300 pre assembly on Sunday 24th February, 5400 to 5500 assembly on Monday 25th February ( takes just over an hour) and was at 9000 Departed Plant early on the 26th February. I didn't catch all the steps as it moved forward so quickly

Last edited by speuk; 03-22-2019 at 02:53 PM.. Reason: Typo
Appreciate 0
      03-22-2019, 03:31 PM   #16
Jgc650i
Private First Class
United_States
80
Rep
126
Posts

Drives: 2019 X5 50i
Join Date: Jun 2013
Location: NY

iTrader: (0)

Mine was originally scheduled for week 10, then got pushed to week 12, then back to week 10, then back to week 12 (not kidding). It went thorough initial production and was in Quality Check as of early this past Monday morning. It's still sitting in Quality Check as of this afternoon. My CA is trying to get an update, but noting yet.
Appreciate 0
      03-22-2019, 05:10 PM   #17
Kotkot
Private
29
Rep
93
Posts

Drives: M4
Join Date: Feb 2019
Location: Nj

iTrader: (0)

Ordered 3/5 took delivery 3/21. I know it was quick but I was able to get early allocation due to fiasco with 3rd row seat ordering.
Appreciate 0
      03-23-2019, 05:12 PM   #18
Jgc650i
Private First Class
United_States
80
Rep
126
Posts

Drives: 2019 X5 50i
Join Date: Jun 2013
Location: NY

iTrader: (0)

Day 6 and counting stuck in Quality Check and still no update or reason for the holdup. . .
Appreciate 0
      03-23-2019, 05:33 PM   #19
frank19x5
Private First Class
frank19x5's Avatar
138
Rep
147
Posts

Drives: 2019 BMW X5 xDrive 40i
Join Date: Feb 2019
Location: CT, USA

iTrader: (0)

Quote:
Originally Posted by dream54ing View Post
Not sure what the timing is for production is, but I've been stuck in "Production begins" for the past 2 weeks. Spoke to a BMW genius rep and was told that its scheduled for finish date of 3/26. In less than 4 days away, it seem unlikely. Is this normal?
Once my car left production begins, it went from Exterior body assembly begins to Awaiting carrier assignment in just over a day. My guess is that you'll see it zip through the process on Monday.
Appreciate 0
      03-25-2019, 09:09 AM   #20
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by frank19x5 View Post
Once my car left production begins, it went from Exterior body assembly begins to Awaiting carrier assignment in just over a day. My guess is that you'll see it zip through the process on Monday.
yep, it zip to entering assembly line this morning! Hopefully not too much of a wait after this
Appreciate 0
      03-25-2019, 11:37 AM   #21
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by davramic View Post
Mines due done on the same day! Also had the stuck in “production begun” status for 2 weeks.

What did you get?
40i
Appreciate 0
      03-25-2019, 11:39 AM   #22
dream54ing
Captain
dream54ing's Avatar
United_States
486
Rep
903
Posts

Drives: 428xi F32- X5 X5 G05 -640i F06
Join Date: Mar 2019
Location: ARIZONA

iTrader: (0)

Quote:
Originally Posted by Kotkot View Post
Ordered 3/5 took delivery 3/21. I know it was quick but I was able to get early allocation due to fiasco with 3rd row seat ordering.
Same here with the 3rd row, after eliminating it from the built, order is coming a long, just a small hiccup.
Appreciate 0
Post Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 01:55 PM.




xbimmers
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
1Addicts.com, BIMMERPOST.com, E90Post.com, F30Post.com, M3Post.com, ZPost.com, 5Post.com, 6Post.com, 7Post.com, XBimmers.com logo and trademark are properties of BIMMERPOST